Balance of plant, where the trips start

The turbine gets the attention. Balance of plant causes the trips.

Talk to an engineer

What this plant needs.

The turbine gets the attention. BOP causes the trips.

  • Obsolete BOP controllersWater, fuel and cooling systems on retired PLCs.
  • Parasitic loadCooling water and fans are the biggest auxiliary load.
  • Emissions on recordCEMS kept running and reporting.

Where we work in the plant.

Every area, and what we do there.

  • Fuel handlingStockyard conveyors into the bunkers, or gas metering and conditioning.
    • Conveyor and weigh-feeder PLC + VFD
    • Metering skid control and flow computation
    Delivered: conveyor consignment + CBM programme
  • Water treatmentRaw water, clarification, RO and demineralisation to boiler-quality make-up.
    • DM / RO plant PLC-5 to modern controller migration
    • Dosing and regeneration sequence control
    Delivered: PLC-5 migration on a captive power plant
  • Boiler & auxiliariesFD and ID fans, air heater, sootblowers and the burner management interface.
    • FD / ID fan VFD and drive migration
    • Damper and airflow control upgrade
    Delivered: boiler DCS revamp scope
  • Emissions, ash & CEMSStack, CEMS analysers, precipitator and the ash handling train.
    • Ash handling PLC and interlock upgrade
    • CEMS data acquisition and compliance reporting
  • Turbine & generator auxiliariesLube oil, seal oil, gland steam, jacking oil and barring gear.
    • Lube-oil skid control and monitoring
    • Auxiliary PLC replacement
  • Condensate & feedwaterCondensate extraction pumps, deaerator, boiler feed pumps and heaters.
    • BFP and CEP drive control and VFD retrofit
    • Deaerator and hotwell level control
  • Circulating water & cooling towerCW pumps, condenser and the cooling tower — the biggest parasitic load.
    • Cooling tower fan VFD and staging
    • CW pump optimisation and energy maximiser
    Delivered: cooling-tower energy maximiser
  • Switchyard, MCC & airStation service, switchgear, MCCs, DC systems and the instrument air plant.
    • MCC refurbishment and power quality assessment
    • Switchgear and busbar thermal monitoring

What it has to meet.

The standards and regulations this plant answers to, built into the design.

  • Clean Air Regulations 2014Continuous emission monitoring (CEMS)
  • IEC 61850Substation automation and communication
  • ISO 50001Energy management on auxiliary load
  • NFPA 70BElectrical maintenance and thermography

What we bring.

Start with the plant, not the proposal.

Send a photo of the panel, the drive or the problem. An engineer answers.

WhatsApp an engineerdean@tgecorporation.com

Technical notes for engineers

Where we work in a power, balance of plant plant

Balance of plant is everything that is not the turbine or boiler island — and it is where the obsolete controllers, unmonitored pumps and unmetered energy sit.

Fuel handling

Stockyard conveyors into the bunkers, or gas metering and conditioning.

  • Conveyor and weigh-feeder PLC + VFD
  • Metering skid control and flow computation
  • Stockyard and yard-machine interlocks
  • Drive and gearbox condition monitoring

Water treatment

Raw water, clarification, RO and demineralisation to boiler-quality make-up.

  • DM / RO plant PLC-5 to modern controller migration
  • Dosing and regeneration sequence control
  • Smart pump control and energy metering
  • Conductivity and silica trending

Boiler & auxiliaries

FD and ID fans, air heater, sootblowers and the burner management interface.

  • FD / ID fan VFD and drive migration
  • Damper and airflow control upgrade
  • Fan bearing vibration + ultrasound CBM
  • Boiler DCS revamp scoping and execution

Emissions, ash & CEMS

Stack, CEMS analysers, precipitator and the ash handling train.

  • Ash handling PLC and interlock upgrade
  • CEMS data acquisition and compliance reporting
  • Precipitator and sootblower sequence control
  • Emissions dashboard for the environmental officer

Turbine & generator auxiliaries

Lube oil, seal oil, gland steam, jacking oil and barring gear.

  • Lube-oil skid control and monitoring
  • Auxiliary PLC replacement
  • Vibration and temperature data interface
  • Trip and first-out event archiving

Condensate & feedwater

Condensate extraction pumps, deaerator, boiler feed pumps and heaters.

  • BFP and CEP drive control and VFD retrofit
  • Deaerator and hotwell level control
  • Feed pump vibration and bearing CBM
  • Recirculation and minimum-flow logic

Circulating water & cooling tower

CW pumps, condenser and the cooling tower — the biggest parasitic load.

  • Cooling tower fan VFD and staging
  • CW pump optimisation and energy maximiser
  • Approach / range performance monitoring
  • Verified savings against a measured baseline

Switchyard, MCC & air

Station service, switchgear, MCCs, DC systems and the instrument air plant.

  • MCC refurbishment and power quality assessment
  • Switchgear and busbar thermal monitoring
  • Compressor sequencing and air demand monitoring
  • Leak survey by ultrasound